Minas Gerais has also been greatly affected by this development. The state in the south-east of the country has a population of around 21 million and is considered the economic heart of Brazil. Mining, steel, and automotive industries are driving economic growth and energy demand. The responsible grid operator CEMIG, one of South America’s largest utilities, now has 4.2 gigawatts of installed PV capacity – most of it in small systems on rooftops and company buildings. Many distribution grids are already reaching their limits.
Maintaining power quality with increasing amounts of PV power being fed to the distribution grids is a key task for those responsible at CEMIG. They must prepare a grid with around 970,000 distribution transformers, which was designed for conventional generation, for a decentralized future. In addition to the high solar potential, weather fluctuations and intermittent cloud cover further impair the consistency of power generation. Therefore, there is a great need in many distribution networks for control systems that can manage bidirectional energy flows. According to Renato Tanasovici, Managing Director of Reinhausen Brazil, studies and field analyses have shown that the voltage regulating distribution transformer (VRDT) does exactly that: under certain conditions, it can increase the absorption capacity of local networks by up to 50 per cent.